Skip to NavigationSkip to Content

About the Council

Standard drawings

Residential Building Works - Plans

Moonee Valley City Council Standard Drawings

Anything constructed in our road reserve must be constructed following the approved Standard Drawing.

 

Drawing Number      Drawing Description Amendment date 
 Complete Set Of All Council Standard Drawings See Title Page
 MV 1  Grated Pit in road Channel  April 2007
 MV 2  Concrete Kerb & channel  September 2006
 MV 3  Semi-Mountable Kerb & Channel  September 2006
 MV 4  Concrete Open Invert Channels  September 2006
 MV 5  Bluestone Kerb & Channel  April 2007
 MV 5A  Fully Mountable Bluestone Kerb  April 2007
 MV 6  Bluestone Kerb & Channel  April 2007
 MV 7  Residential Concrete Vehicular Crossing  September 2006
 MV 7A  Special Concrete Residential Concrete Vehicular Crossing  September 2006
 MV 7B  Special Bluestone Residential Concrete Vehicular Crossing  September 2006
 MV 8  Commercial Concrete Vehicular Crossing  September 2006
 MV 9  Standard Concrete Layback Kerb  September 2006
 MV 10  Bluestone Splitter Island  April 2007
 MV 11  Concrete Splitter Island  September 2006
 MV 12  Concrete Splitter Island Type B  September 2006
 MV 13  Side Entry Pit (B Type Kerb)  April 2007
 MV 13A  Grated Double Side Entry Pit (B Type Kerb)  April 2007
 MV 13B  Haunched Grated Double Side Entry Pit (B Type Kerb)  April 2007
 MV 13C  Side Entry Pit (SM2 Type Kerb)  April 2007
 MV 14  Concrete Kerb Reinstatement Detail  September 2006
 MV 15  Not used  
 MV 16  Not used  
 MV 17  Not used  
 MV 18  Not used  
 MV 19  Not used  
 MV 20  Pram Crossing Detail  September 2006
 MV 21  Pram Crossing Detail  September 2006
 MV 22  Heavy Duty Pram Crossing Detail  September 2006
 MV 23  Traffic Island Detail  September 2006
 MV 24  Lawn Reinstatement Detail  September 2006
 MV 25A  Standard Asphalt Watts Profile Road Hump  September 2006
 MV 25A(2 of 2)      Standard Asphalt Watts Profile Road Hump  September 2006
 MV 25B  Standard 4.0m Asphalt Flat Top Road Hump  September 2006
 MV 25C  Standard Asphalt Flat Top Road Hump At Pedestrian Crossing  November 2005
 MV 25D  Asphalt Speed Cushion  August 2006
 MV 26  Pipe Laying and Backfill Construction Detail  September 2006
 MV 27 (1 of 3)  Stormwater Drain Connections  September 2006
 MV 27 (2 of 3)  Stormwater Drain Connections   September 2006
 MV 27 (3 of 3)  Stormwater Drain Connections  September 2006
 MV 28  House Drain Pipe Connections  September 2006
 MV 29  Side Entry Pit - Construction Details  April 2007
 MV 29A  Side Entry Pit (SM2 Type Kerb) - Construction Details  April 2007
 MV 30  Junction Pit Construction Details  April 2007
 MV 30A  Grated Junction Pit & Surround Construction Details  April 2007
 MV 31  Side Entry Pit With Grate - Construction Details  April 2007
 MV 31A  Modified Grated Side Entry Pit - Construction Details  September 2006
 MV 31B  Modified Grated Side Entry Pit (SM2 Type Kerb) - Construction Details   March 2007
 MV 31C  Side Entry Pit With Grate (SM2 Kerb) - construction Details  April 2007
 MV 32  Haunched Junction Pit Details Up To 3.6m Depth  September 2006 
 MV 33  Grated Haunched Driveway Junction Pit - Construction Details  April 2007
 MV 34  Standard Reinforced Concrete Pavement For Right Of Way's(R.O.W's)  September 2006
 MV 35  Agricultural Drain Detail  December 2005 
 MV 36  Concrete Bike Path Detail  September 2006
 MV 37  Anchor Block  May 2006
 MV 38  Brick Band & Paving Detail  October 2006
 MV 39  Details of Various Footpaths  October 2006
 MV 40  Moonee Valley Electricity Pit Lid  June 2007
 MV 41  Agricultural Drainage Pipes  July 2007
 MV 42  Typical Reinstatement Works & Stormwater Connection Details  July 2007
 MV 43  Asphalt Right Of Way (R.O.W) Typical Sections  August 2007

Was this page helpful?

Further Information
Last updated: Thursday, 19 December 2013, 2:21 PM